Great Lakes Renewable Energy, Inc.
Great Lakes Renewable Energy, Inc.
Great Lakes Renewable Energy, Inc.
AGRI-APPLICATIONS
We offer savings in
Agricultural applications

Turkey Barns
Poultry Barns
Broiler Barns
Hog Barns
Cattle Barns
Greenhouses
Equine arenas
Egg Operations
40% to 60% heat savings
  • Healthier animals
  • Lower starter mortality
    rates
  • Cleaner air for workers
  • Dryer barns
  • Capital expenditure
    paybacks within 3
    years in most cases
  • Complete financing
    programs

  • Leasing programs

  • Grant/aid funding support
CONVERSION TO BIOMASS HEAT

SAVINGS 40% TO 60%
HEATING FUEL

KEEP OLD SYSTEM FOR BACKUP
Propane at $2.00/gallon
is $ 28.07/mbtu
Biomass pellets at $160.00/ton Delivered
is $ 12.19/mbtu
If you spend $10,000.00 on propane
You will spend $ 4,343.00 on biomass

Complete turn-key automated systems
CALL
Fuel
(715) 866-8535
OR:
ADVANCE BIO HEAT, LLC.
Commercial Installer/Financing
(763) 262-0071

FOR MORE INFORMATION
One of the stablest
priced fuels in the
industry over the past
ten years
Note: We are a biomass wood
pellet manufacture with many
large commercial accounts.
We work closely with trusted
and proven installer
companies. We can
recommend total turnkey
installation companies for your
particular application.
COST PER MILLION BTU
ADVANCE BIO HEAT

500,000BTU TO 850,000 BTU
FORCED AIR FURNACE
LOW PROFILE MODULAR BIN FUEL
FEEDER SYSTEM

  • AUTOMATED AUGER FEED
  • NO ELEVATED TANKS
  • NO CEMENT PADS
  • MODULAR PORTABLE NO TAX
  • 2 WAY FILLING
  • EASY ENTRY TOTE BAG FILLING
  • AUGER FILLING CAPABILITY
  • VARIOUS ADD-ON SIZES
  • SIMPLE MAINTENANCE
  • EASILY MOVABLE
  • 8,000LB MODULE UNITS
    EXPANDABLE
  • PRE-MANUFACTURED UNITS SETUP
    IN ABOUT 6 HOURS
  • TYPICALLY LESS THAN 4 YEAR
    PAYBACKS
ADVANCE BIO HEAT LLC.
763-262-0071
DOWNLOAD BROCHURE
BOILERS AND FORCED AIR FURNACES  430,000 BTU TO 6.5 MILLION BTU
BASE UNIT UNIVERSAL FEEDER HOPPER BEING CONSTRUCTED
copyright trademark
patent pending 2012
copyright trademark
patent pending 2012
Roof and upper cabinet not installed
WE THOUGHT OF THAT TOO!
" What if natural gas becomes available after we convert to biomass?" "What if we
want to be able to have both biomass and either natural gas or LP gas capability?"
No problem! We have a very simple gas conversion capability for switching back
and forth when required, it can be installed during initial installations or after when
it becomes required or desired. All the other installed components stay the same!
Easy clamp and tote grabber